Production line of 1981 Revamped



By
Sedacta
25 March 17
0
comment

For a customer in Spain, the electrical cabinets, main desk and wiring were renewed. Although it was an old press, we could refurbish this old machine with a new controller, electrical cabinets and operation desk. All servo motors and sensors were renewed. Also the control of the equipment before and after the press were integrated in our operating panel.

Thanks to the new controller this line is able to perforate billions of accurate holes in the next decade. With the integrated diagnostic tool we can offer remote assistance when needed.